Construction and reconstruction of boiler houses
Reconstruction of a gas boiler house on Bazhenova St., 15-a VINNYTSIA

Period: April 2014 – September 2016

Name of the program (MFI): SECO (State Secretariat for Economic Affairs)

Project amount:: 494,134 euro

Technical description: The boiler house building was completely reconstructed, worn equipment was dismantled and new equipment was installed, namely:

  • Viessmann gas boilers in the amount of 3 units, with a total capacity of 18 MW;
  • Weishaupt burners in the amount of 3 units;
    smoke pipes in the amount of 3 units. and gas pipelines;
  • Wilo pumping stations;
  • SCADA system;
  • BWT Ukraine water treatment system;
  • control and measuring devices, automation, electrical equipment.
Construction of a solid fuel boiler house on Bazhenova street, 15-a VINNYTSIA

Period: April 2015 – September 2016

Name of the program (MFI): SECO (State Secretariat for Economic Affairs)

Amount of the project: 654,347 euro

Technical description: A new solid fuel boiler house was built, modern equipment was installed and installed to improve the city’s heat supply system in 2 microdistricts:

  • 2 Viessmann boilers (Mawera FSR2600) with a total capacity of 5.2 MW;
  • 2 smoke pipes and gas pipes;
  • Wilo pumping station;
  • electrical equipment
Supply of solid fuel boilers for the construction of a boiler house on Zulinsky St., 9th VINNYTSIA

Period: September 2017 – December 2018

Name of the program (MFI): SECO (State Secretariat for Economic Affairs)

Amount of the project: 460,198 euro

Technical description: Equipment supplied during the construction of a solid fuel boiler house:

  • a Viessmann boiler with a capacity of 3.3 MW, operating on the combustion of wood chips;
  • 1 smoke pipe and gas pipes;
  • software complex of SCADA systems;
  • Thermaks heat exchangers;
  • electrical equipment, valves, valves, automobile scales