Construction and reconstruction of boiler houses
Reconstruction of a gas boiler house on Bazhenova St., 15-a VINNYTSIA
Period: April 2014 – September 2016
Name of the program (MFI): SECO (State Secretariat for Economic Affairs)
Project amount:: 494,134 euro
Technical description: The boiler house building was completely reconstructed, worn equipment was dismantled and new equipment was installed, namely:
- Viessmann gas boilers in the amount of 3 units, with a total capacity of 18 MW;
- Weishaupt burners in the amount of 3 units;
smoke pipes in the amount of 3 units. and gas pipelines; - Wilo pumping stations;
- SCADA system;
- BWT Ukraine water treatment system;
- control and measuring devices, automation, electrical equipment.
Construction of a solid fuel boiler house on Bazhenova street, 15-a VINNYTSIA
Period: April 2015 – September 2016
Name of the program (MFI): SECO (State Secretariat for Economic Affairs)
Amount of the project: 654,347 euro
Technical description: A new solid fuel boiler house was built, modern equipment was installed and installed to improve the city’s heat supply system in 2 microdistricts:
- 2 Viessmann boilers (Mawera FSR2600) with a total capacity of 5.2 MW;
- 2 smoke pipes and gas pipes;
- Wilo pumping station;
- electrical equipment
Supply of solid fuel boilers for the construction of a boiler house on Zulinsky St., 9th VINNYTSIA
Period: September 2017 – December 2018
Name of the program (MFI): SECO (State Secretariat for Economic Affairs)
Amount of the project: 460,198 euro
Technical description: Equipment supplied during the construction of a solid fuel boiler house:
- a Viessmann boiler with a capacity of 3.3 MW, operating on the combustion of wood chips;
- 1 smoke pipe and gas pipes;
- software complex of SCADA systems;
- Thermaks heat exchangers;
- electrical equipment, valves, valves, automobile scales