tel. +38 (044) 453–77–85 (86) :: e-mail: kec2006@ukr.net :: address: Kyiv, str. Olzhycha, 5-A, office 62    

Implemented projects
буд-во та реконстр__Винн_Баженова_газ.котельня 2

Reconstruction of a gas boiler house on Bazhenova St., 15-a VINNYTSIA

Period: April 2014 – September 2016

Name of the program (MFI): SECO (State Secretariat for Economic Affairs)

Amount of the project: 494,134 euros

буд-во та реконстр__Винн_Баженова_тв.топл.котельня 4

Construction of a solid fuel boiler house on Bazhenova Street, 15-a VINNYTSIA

Period: April 2015 – September 2016

Name of the program (MFI): SECO (State Secretariat for Economic Affairs)

Amount of the project: 654,347 euros

Read more …

модерн.кателен_Житомир_ДОмбровского_4

Supply of gas boilers for the modernization of the boiler house on Zulinsky str., 9 VINNYTSIA March 2017 – December 2018

Reconstruction of engineering inlets of multi-apartment residential buildings with installation of thermal energy metering devices Kherson December 2016 – December 2018

Replacement of boilers NIISTU-5 in the boiler house on the street. Dombrovsky, 30 ZHYTOMYR July 2014 – March 2015

Replacement of condensation feed pumps in the “Pivdenna” boiler house, Pershotravenska, DNIPROPETROVSKA REGION. December 2017 – July 2018

Installation of new and modernization of existing equipment 20 ITPs, balancing and flushing of internal heating systems, thermal insulation of pipelines and installation of heat energy metering devices in public sector institutions (schools, gymnasiums, branches of the Central Bureau of Labor and Welfare), Zhytomyr January 2017 – December 2018

Read more…

освещение Винница 2

Performance of capital repairs of street lighting networks by means of technical re-equipment of lamps based on LED technologies and implementation of a city-wide street lighting control system RUBIZHNE February 2019 – March 2020

Reconstruction of the outdoor lighting system in the city of Vinnytsia, June 2020 – August 2021.

Read more…

когенер.установка_Донецк 2-600

Installation of a cogeneration plant in the city of Donetsk in 2013

In 2013, a Caterpillar CAT-1500 cogeneration unit, which runs on natural gas, was installed at the boiler house of the “DONETSKMISKTEPLOMEREZHA” KKP at 96 Ionina St. in Donetsk.

KGU produces electric energy to meet the needs of the boiler house and the company’s facilities, as well as thermal energy, which is used to heat the return coolant.

Read more…

worldbank

Together with the company “COWI” (Denmark) in 2018, the project “Preparation of design and tender documentation” was implemented for the reconstruction of heat networks with the installation of ITP and the technical re-equipment of boiler houses with the installation of automated technological process control systems in the city of Kherson » within the framework of the signed Contract UDHEEP-KHE-QCBS-05.

As part of the project “Preparation of project and tender documentation for the reconstruction of heat networks with the installation of ITP and technical re-equipment of boiler houses with the installation of automated technological process control systems in the city of Kherson”, we have developed a basic scheme of heat supply for six micro-districts of the city.

A project solution has been prepared for the reconstruction of 15 boiler rooms, 13 ITPs, 28 km of distribution networks for heating and domestic hot water. The total cost of the project is 5.6 million dollars.

Read more…

кап.ремонт__Славутич термомодерн.ЗОШ 4__1

Reconstruction of the roof of the building of the Kramatorsk Ukrainian Gymnasium of the Kramatorsk City Council, located at the address: st. Arkhangelska, 11, Kramatorsk, Donetsk region Period: June 2020 – October 2020 Name of the program (MFI): NEFCO (Northern Environmental Finance Corporation) Project amount: 435,073 euros

Project “Major repair (thermo-modernization) of the building of the Slavutytsk comprehensive school of grades I-III No. 4 of the Slavutytsk city council of the Kyiv region” Period: June 2020 – December 2020 Name of the program (MFI): NEFCO (Nordic Environment Finance Corporation) Project amount: 16,068,000 euros

Read more. ..

Gallery "Commemorative plaques of completed works"